|
Quartz Oscillators and Phase Locked Loops |
|
| Atomic Frequency Standards Dr Mike Garvey, Chief Technology Officer, Symmetricom, USA |
|
| Update on the Galileo Programme Dr Stefan Bedrich, Head of Satellite Navigation Dept., Kayser Threde, Germany |
|
| GPS Current Status & Future Enhancements Dr Marc Weiss, Telecom Sync and GPS expert, NIST, USA |
|
| Time & Timing Measurement Fundamentals – MTIE/TDEV Lee Cosart, Senior Technologist, Symmetricom, USA |
|
| Synchronisation in Telecom Networks Jean-Loup Ferrant, Synchronisation Expert, Alcatel, France |
|
| Traditional Synchronisation Standards Overview Silvana Rodrigues, System Architect, Zarlink Semiconductor, Canada |
|
| An Introduction to Packet Switching for Sync Engineers Stewart Bryant, Technical Leader, Cisco Systems, UK |
|
| Synchronisation Principles for Packet Networks Dominik Schneuwly, Senior Engineer, Oscilloquartz, Switzerland |
|
| The New Timing Standard for Packet Networks G.8261 Stefano Ruffini, Synchronisation Expert, Ericsson, Italy |
|
| Functional Modelling for Synchronisation Networks Michael Mayer, Network Timing and Synchronization Standards Specialist, Nortel, Canada |
|
| Layer 1 Synchronous Ethernet Mike Gilson & Tony Flavin, Lead Technology Consultant, BT, UK |
|
| Latest Developments with the IEEE-1588 Standard Dave Tonks, Principal Engineer, Semtech, UK |
|
| Layer 2 Sync in Packet Networks Ron Cohen, Chief Technology Officer, Resolute Networks, Israel |
|
| New uses for synchronization in network infrastructure Stewart Bryant, Technical Leader, Cisco Systems, UK |
|
| Fixed Line Revolution - BT 21CN Project Mike Gilson, Lead Technology Consultant, BT, UK |
|
| The Mobile Perspective Brian Mason, Manager Transmission Infrastructure Support, T-Mobile, UK |
|
| Synchronisation in GSM & 3G Networks Martin Kingston, Principal Engineer, Orange, UK |
|
| Timing Requirements In IPTV Solutions Vandana Upadhyay, Senior Director Business Development, Symmetricom, USA |
|
| Time & Timing in Defence Applications Mark O’Dare, Senior Network Analyst, EADS, UK |
|
| 24x7 Sync Monitoring Case Studies Chris Farrow, Technical Services Manager, Chronos Technology, UK |
|
| Timing Measurements In Packet Networks Lee Cosart, Senior Technologist, Symmetricom, USA |
|
| Investigation and testing of Layer 2 Timing Distribution using Ethernet Provider Backbone Transport (PBT) Michel Ouellette, System Architect, Nortel, Canada and Simon Brueckheimer, Consultant Architect, Nortel, UK |
|
| Jitter and Wander Testing in High-Speed Telecom Networks Andreas Alpert, Senior Product Manager, JDSU Communications Test & Measurement, Germany |
|
| Validating Real-Time IP Services through Pre-Deployment Testing Kevin Przybocki, Co-founder, Anue Systems, Inc., USA |
|
| The Need for Immunity, Transfer & Availability Standards Charles Curry, Managing Director, Chronos Technology, UK |
|
| Test Processes in the G.8261 Standards Tim Frost, System Architect, Zarlink Semiconductor, UK |
|
| Synchronous Ethernet for Next-Generation Metro Ethernet Networks Michel Ouellette, System Architect, Nortel, Canada |
|
| More Type Approval Testing for NGNs Jean-Loup Ferrant, Synchronisation Expert, Alcatel, France |
|
| Synchronisation Issues for IP-based Multimedia Hugh Melvin, Lecturer/Researcher, National University of Ireland, Galway, Ireland |
|
| Intranode Timing for Triple Play Solutions Perspective from Telecom’s ITU G.tti, and Cable’s DOCSIS 3 George Zampetti, Chief Scientist, Symmetricom, USA |
|
| Upcoming Wireline Operators Challenge On Synchronisation Laurent Montini, Consulting Engineer, Cisco Systems Europe, France |
|
| Timing and Synchronisation Performance of IEEE 802.1AS and its Application in Audio/Video Bridging (AVB) and beyond Kees den Hollander, Senior Researcher, Samsung Advanced Institute of Technology, Korea and Dr Geoffrey Garner, Senior Researcher, Samsung Advanced Institute of Technology, USA |
|
| Sync Requirements for Wireline and Wireless Convergence Dr Ghani Abbas, International Standards Manager, Ericsson, UK |